手机:+86-15630032788
手机:+86-15830032788
手机:+86-15631058198
邮箱:HWFFASTENER@139.COM
ANII@HWFFASTENER.COM
联系人:董经理
地址:河北省邯郸市永年区西南开发区西环路温窑村东2016年07月22日 来源: DIN931、DIN933、DIN6921、DIN975、DIN934、DIN315、DIN912、DIN985、DIN6923,化学锚栓_车修壁虎_钻尾螺丝_汽车螺丝_邯郸市海威五金制品有限公司
1.Drill a hole in the base material using the appropriate diameter carbide drill bit as specified in the table. Drill the hole to the specified embedment depth plus 1/8" for flush mounting. Blow the hole clean using compressed air. Overhead installations need not be blown clean.
2.Insert designated anchor into hole. Tap with hammer until flush against surface.
3.Using the designated drop-in setting tool, drive expander plug toward the bottom of the anchor until shoulder of setting tool makes contact with the top of the anchor.
4.Minimum thread engagement should be equal to the nominal diameter of the threaded insert.
This is the process of installing drop in anchor